INVITATION FOR THE PRE-QUALIFICATION OF CONTRACTORS FOR 132/33KV TRANSMISSION LINES & SUBSTATIONS REHABILITATION PROJECTS AND EQUIPMENT SUPPLY
- INTRODUCTION
Kaduna Electricity Distribution Company (KAEDC) has received a CREDIT facility from the Central Bank of Nigeria (CBN) for Accelerated Transmission – Distribution Interface Projects to invest in the Transmission Company of Nigeria (TCN)’s rehabilitation and expansion projects.
- SCOPE OF WORKS
LOT/KAEDC/LINES/1
Re-conductoring of 132kV Zaria-Funtua-Gusau Single Circuit Transmission Line (190KM)
LOT/KAEDC/SS/1
Upgrading of 1×30 MVA, 132/33kV power transformer with 1×60/66 MVA, 132/33kV at Gusau 132/33kV Substation.
LOT/KAEDC/SS/2
Upgrading of 90MVA, 330/132/33kV Auto transformer with 1×150/165 MVA, 330/132/33kV at Birnin Kebbi 330/132/33kV Substation.
LOT/KAEDC/SS/3
Construction and installation of 1x45MVA Mobile transformer 132/33kV Substation (down dropper on the existing B/Kebbi-Sokoto 132kV S/C transmission line) at Argungu
LOT/KAEDC/SS/4
Installation of 1×60 MVA, 132/33kV power transformer at Sokoto 132/33kV Substation.
LOT/KAEDC/SS/5
Supply of:
- 2 No 150/165 MVA, 330/132/33kV Power Transformer
- 2 No 100/125 MVA, 132/33kV Power Transformer
- 2 No 60/66 MVA, 132/33kV Power Transformer
- 1 No. 60/66 MVA, 132/33kV Mobile power transformer
LOT/KAEDC/SS/6
Construction and installation (Turn-in, Turn-Out) of 2x150MVA, 330/132/33kV Transformer, 2x330kV bay extension, and 2x60MVA, A 132/33kV Transformer and 2×3 Number Associated Outgoing 33kV at Millennium City, Kaduna
- ELIGIBILITY REQUIREMENTS (NIGERIAN COMPANIES ONLY)
Suitable Nigerian Companies are invited to participate in the prequalification exercise by submitting the following pre-requisite requirements: